Abigail Marie the Chef with IBD
Professional Chef with IBD helping you navigate food, lifestyle, new IBD research, and patient advocacy.
| Feature | SEWA (Sharjah) | DEWA (Dubai) | ADDC (Abu Dhabi) | | :--- | :--- | :--- | :--- | | | IEC + Local amendments | UAE Fire Code + IEC | WS Regulation + IEC | | Max Earth Resistance | 1 Ohm (Industrial) | 5 Ohm (General) | 2 Ohm | | Meter Panel | SEWA-provided seal mandatory | Contractor supplied (DEWA specs) | ADDC supplied | | Aluminum Conductors | Allowed >10mm² for final circuits | Prohibited for final circuits | Allowed only for feeders | | RCD Requirement | 30mA for all sockets | 30mA for sockets <32A, plus 100mA for fire | 30mA for all final circuits |
A: In case of legal dispute, the Arabic version of the SEWA regulations is the authoritative text. However, inspectors accept technical English drawings.
A: Yes, a separate section (Chapter 14 as of 2023 revision) covers grid-tied solar PV, requiring bi-directional meters and anti-islanding protection. Sewa Regulations For Electrical Installations Pdf
SEWA inspector arrives with a tablet. He checks earthing resistance (2 Ohms = Pass). He checks RCD trip (0.29 sec = Pass). He verifies conductor colors: Brown (L1), Black (L2), Grey (L3), Blue (N), Green/Yellow (E) – as per PDF Clause 3.15.
When planning any electrical project in the Sharjah Emirate—whether a new villa, a commercial high-rise, or an industrial factory—one document reigns supreme: . SEWA (Sharjah Electricity, Water and Gas Authority) is the sole regulatory body governing electrical connectivity in Sharjah. Unlike Dubai (DEWA) or Abu Dhabi (ADDC), SEWA enforces a unique set of codes derived from international standards (IEC) modified for local environmental conditions. | Feature | SEWA (Sharjah) | DEWA (Dubai)
Using Clause 7 of the PDF (Submissions), they compile: Load schedule, Single Line Diagram (SLD), Earth plan, and material list. They submit via SEWA's Tawasul system.
The electrician carries the printed table from the PDF to verify bending radius of armoured cables (Clause 6.1.4). They install meter panel exactly 1.5 meters above finished floor (Clause 4.3.2). SEWA inspector arrives with a tablet
By: Electrical Safety & Compliance Team